How to Install Sewage Ejector Pump Replacement


0

Facing the problem of leakage in the pipes and the overflow in the water pipes is a very natural and common problem. A maximum number of house owners have to go through this particular problem every now and then. Therefore, to avoid the circumstances, people should always keep a backup plan. If you do not want to waste your water by damaging pipes or for any other reasons, you can take the help of a sewage ejector pump replacement. It not only helps you to save water in your house but at the same time, you can also use all the necessary things in your house without facing any problems.

Subsequently to properly keep the joints of the pipes maintained and to replace the old pump, the house owner can seek the advantage of sewage ejector pump replacement. There are very simple steps that you need to follow to replace the ejector pump at your house. But thousands of people are taking the help of experts to replace the ejector pump quickly because they do not want to bring out any complications. However, if you want to replace the old ejector pump by yourself you need to go through some of the quick and simple steps.

Steps to follow to install sewage ejector pump replacement

Today here in this article to the help of this paragraph we are going to share all those necessary steps that you need to simply go with to replace the ejector pump. Let’s follow the article and quickly explore all the steps that you need to practice.

1. Prepare the Basin

The very fast step is to prepare the basin to replace the old ejector pump. At first, the house owner will have to examine whether there are any damages or pit signs in the basin. Then the house owners will have to remove the loose materials or debris from the wall of the basin that are stuck. By taking the help of a scraping tool, you will be able to give a strong new seal.

2. Install New Check Valve

Immediately after that, you will have to install a new check valve at the previous location in the basin. At the same time you can also purchase a quick check valve it will be silent but work more efficiently. This is a great feature for all the basement bathrooms. Not only that, but if you want to get rid of all the possibilities of backflow in the future then you need to keep a ball valve. Just place the ball valve as close to the check valve.

3. Test the Pump and Float Switch

After the installation, now here is the time to check out the ejector pump. Just plug in the ejector pump to a dedicated circuit. Switch the pump to know whether it is activated or not. Keep the pump running, so that you can properly understand whether the pump is working or not. Similarly, it will also help you to avoid damage as well.

4. Attach Adapter and Pump to Discharge Pipe

Now here is the time to attach the male threaded adapter. You can probably take the help of the PVC cement and primer to set it with PVC pipe. At the same time, you need to properly check whether it is tightened or not. Make sure it does not become over-tightened.

5. Drill a Weep Hole

After that, on the PVC pipe, you will have to make a hole with the drill machine. It will eventually lock all the air blockages. And it will help the pump to run on dry air. Not only will that it also not bring the water flow from the basin as well.

6. Measure and Cut PVC Pipe

The next step is to measure and cut the PVC pipes. If you are going to replace the bottom of the PVC pipe then first you need to take the right measurement before replacing it. However, the final measurement of the PVC pipe can be a little bit different after installing the new check valve. By using a sharp knife you can also give a perfect finishing to the bottom of your PVC pipe.

7. Lower Sewage Pump Into Ejector Pit

After that, every one of you will have to take the help of the discharge pipe. The pipe should be attached very gently to the sewage pump. You will have to attach the ejector pit in both of the lower parts of the basin.

8. Attach Discharge Pipe to Check Valve

After that, by taking the help of primer glue, you need to attach the coupler to the top of the PVC pipe. However, before attaching the check valve properly, you need to slide the adapter onto the bottom of the new check valve, and before you attach it to the discharge pipe. By taking the help of the glue again you need to attach the coupler pipe. Against slide the Adapter slightly and make it a little bit tight.

9. Set Sewage Basin Cover

After that, after following all the above mention steps you will have to set the sewage basin cover. Notice well whether the new gasket is attached or not properly. But before placing the cover for your basin, give a loose discharge pipe slightly. On the other side, you will have to make sure all the electrical wires are pulling the pump accurately.

10. Set Vent Pipe to Top of Basin Cover

And at the last to replace the ejector pump also have to take the help of attaching pipes. Make sure all the pipes are linked with each other properly and working as well. Not only that, you will also have to check out all the local building codes How to avoid unnecessary problems in the future time.

Conclusion

Therefore these are the most common steps that all of you need to follow to install a sewage ejector pump replacement at your house.


Like it? Share with your friends!

0

What's Your Reaction?

hate hate
0
hate
confused confused
0
confused
fail fail
0
fail
fun fun
0
fun
geeky geeky
0
geeky
love love
0
love
lol lol
0
lol
omg omg
0
omg
win win
0
win
admin